Showing posts with label Washington. Show all posts
Showing posts with label Washington. Show all posts

Monday, April 8, 2019

More Signs of Spring


Snow banks were reduced further in late Sunday's
rain, and in the morning's warmth mist hung over
Lobdell Point Road.


Detroit Harbor -

Always a slow process, the cool weather of the past several weeks slowed up melting of snow banks, and the reduction in bay and harbor ice.   Ever so slowly it disappears and softens, but it was only Saturday, March 30, a little over a week ago, when the bay broke up and fields began moving.  Large pieces headed toward the Door passage with the potential of blocking, or halting, the ferry in its movement. The last scheduled crossing of the afternoon was called off.  Patience proved a good thing as ice piled against the shoreline on the Green Bay side of the Island, providing spectacular shoves in the late afternoon, we were told.  By morning, ice movement had eased, and broken fields lay to the west of the Door Passage.

Otter's unmistakable profile was an early morning surprise.



















We've often observed evidence of an otter having passed through the Bayou area, leaving characteristic sliding and tail marks behind in the snow.  Similarly, it often left behind unmistakable piles of excrement loaded with shells, crawfish parts and fish scales.   Two days ago Mary Jo spotted an otter crossing the harbor ice, harassed by three crows as it scampered its way to the nearest hole in the ice.  This morning while having breakfast, grandson Zander saw the otter on the ice south of our home.  I fetched my camera, guessing it might swim for the next opening to the north.  It did.  Quite elusive until now, I think he or she's making a home nearby.  Could be a rough time in store for the small mouth bass that spawn in this general area later in spring.

As dark crept in yesterday afternoon and rain fell, lowering visibility, 37 sandhill cranes made an appearance on the harbor ice.  They landed one pair at a time, in intervals, as if signaled to do so from a control tower.  There, they congregated on the ice for the night.  This morning they were still together, only farther out, across the harbor, closer to Snake Island.  A variety of ducks, Canada geese, eagles and now the first great blue heron are among the visitors making an appearance each day as the openings in the ice enlarge.



In terms of human activity this morning, members of the ferry crew found ideal conditions to prepare the Washington for the season.

This part of the harbor happens to be ice free at the moment, but up in the shallows there's soft ice.  Fields of ice, given the right push by wind, could still cause challenges.  But, for the most part, reductions in ice will increase.  Wind and rain are now the best thing to speed up the process.  A bit of rain tonight is forecast, then snow Wednesday night into Thursday.  Maybe our last significant snow of the season?

Jeff Cornell buffs fiberglass benches on
the Washington passenger deck.


Pete Nikolai touches up with a wire brush while Tully Ellefson steadies the raft, an annual task to keep the hull and exterior bulwarks in good condition.  Above, on the upper deck, Jeff Cornell buffed fiberglass benches.  Soon, more ferries will be in use, underway, as one-by-one each is cleaned, painted and readied for the season.

Pete Nikolai (L) and Tully Ellefson man the painting
raft in this morning's calm.
 -  Dick Purinton



Tuesday, May 2, 2017

CATCHING UP






Detroit Harbor, Washington Island, Wisconsin -

Realizing that it's been nearly two months since my last posting, this blog will touch on a variety of topics.

The photo that begins this column is of the Stavkirke when folks gathered for the Saturday evening Vigil Service, on the eve of Easter.

Rain had let up by this time and a light haze hung low over fields, but the temperature was moderate, in the 50s, making this a pleasant evening.

Inside the Stavkirke, electric baseboard heaters that were turned on well in advance helped warm the space.

I had a second reason for attending this service.  My goal was to obtain a few good photographs to include in a book I'm working on about the Island Stavkirke.   Low light photos, and photos of worship activities were shots I hoped to add as contrast to the many others that will appear in the book.

Photos will comprise the primary content, with text and comments made by those closely involved with its design, construction and use.  No exact publication date can yet be determined, but I'm hoping for a late June or July book launch, if all goes well.  Over 100 photos and illustrations, in color, will be featured, that reflect back twenty five years or more.

Trinity Lutheran Church Pastor Alan Schaffmeyer led
the Vigil Service in the Stavkirke.  Dan Hansen (not shown)
helped lead musical selections by playing an electric keyboard.
(Note: Open flames are generally not permitted on the
Stavkirke grounds or in the church, but use of candles during
this special service is one exception.)


At my prompting, Steve Waldron also took photos that same evening, and his results with a quality Canon camera were far better than mine, both in composition and technical quality.  However, I'm saving Steve's photos for the book.  These photos should give you a sense, at least, of what the service was like with low candlelight, in a quiet setting (Quiet, except for the occasional squeak of floorboards and hymns that were sung).  

By coincidence, two of our grandsons, Aidan and Magnus Purinton, were baptized in the Stavkirke the following Saturday with family members present, a pleasant and intimate setting for their ceremony.

Increased, dedicated Stavkirke parking 

Last January a plan was announced by the Trinity Church Council to create a new parking lot for Stavkirke visitors.  By creating dedicated parking to the west of the Stavkirke, with entrance from Town Line Road, more spaces and safer access should result.  Currently, vehicles including buses and tour trams park wherever space is available along the Town Line Road, where already many vehicles may be found,  parked by those using Trinity's facilities.

A fund raising campaign was begun following January's approval by the Trinity congregation. To date, approximately $11,000 has been raised, with $25,000 being the stated goal.

In addition to the already donated dollars, a most generous offer was made by David Small, Island contractor, to provide excavation labor and equipment.  David's offer was accepted, with thanks, by the Church Council.

At this point, it seems certain that work can begin within the next several months.  Possibilities and choices now exist for an improved sidewalk surface (concrete vs. gravel or woodchips), plus the eventual need to blacktop the parking surfaces and driveway.  The $25,000 figure may be still be a conservative goal, given the long-term list of requirements.

Therefore, funds continue to be sought for this project.

Future parking lot diagram with entrance at Town Line Road.
Stavkirke is to the east (right) and Trinity Lutheran Church to the south
(bottom), across the road from the Stavkirke property.

The attached graphic shows a loop-style parking area that will undergo slight modifications prior to actual construction, to account for several existing, large spruce trees, but as a general plan it shows how the new parking design will look.  

Donations for the Stavkirke parking improvement can be made c/o:  Stavkirke Fund, Trinity Lutheran Church, 1763 Town Line Road, Washington Island,
Wisconsin 54246.  

Ferry Washington gets new wheels

In late November a loud "thunk" was heard by the crew of the Washington as the ferry backed toward the Island pier.  Afterward, the vessel's starboard shaft produced a profound shudder.  The noise and vibration was traced to the starboard propeller, resulting when one of the propeller blades came in contact with a sheet of steel that had been placed on the end of the pier to prevent loss of fill from the dock.  That sheet of steel, it is believed, came loose from the pier structure at an earlier juncture. It then lifted from the bottom with the suction and turbulence caused by prop wash, rising from the bottom enough to contact one of the blades.

The ferry was rendered inoperable following that incident, due to the significant vibration.  It was decided then to winterize the vessel and order a replacement propellers, with a dry docking scheduling for early spring, once the bay was ice-free.

Chris Swanson holds the broken
Washington propeller blade, weighing an
estimated 80 pounds.  Impact point that
separated blade from hub can be
on the left.


The subject blade shown here, and the steel sheet, were recovered by Hoyt Purinton, who dove to attach lines for retrieval.  While the remaining three of four blades appeared intact, consultation with propeller manufacturer Kahlenberg indicated that repair of this broken blade wouldn't be possible.  And. since propellers come as a matched pair, replacement with a new pair would be the best option. This necessitated several months lead time for production.

So, during the first week of April, with only mushy ice remaining in the lower bay, the Washington ran slowly on a single, port prop to Sturgeon Bay, where it was dry docked and new wheels were installed.  As it happened, stainless was quoted cheaper than nickel-bronze, so that the new propellers would be sturdier and more resistant to errant objects, such as deadheads, than the old set.  

In addition to propeller replacement, a U. S. Coast Guard, five-year hull inspection was also conducted ahead of the required due date.  This inspection activity is required for each ferry at five-year intervals, and doing so whenever a dry dock opportunity presents itself hopefully extends the time to the next required docking deadline.

Also, prior to this yard visit, it was determined that a slight widening of the stern ramp would facilitate the loading of long and large vehicles, such as semi trucks and trailers.    The ramp opening was therefore increased by one foot on each side - and the ramp leaves were widened accordingly - by moving of the uprights, hydraulic piping, and cable arrangement to accommodate this change.  Now repainted, the average traveler won't notice the change unless the area is examined closely for signs of metal work.  All such work, of course, requires both naval architect plan detail and U. S. Coast Guard approval prior to actual work being done.

With all work completed in approximately eleven days, the Washington sailed back to Detroit Harbor, where it was cleaned, touched-up and placed into service.

Antler hunting as a sport

What Island bucks lose over winter, antler hunters hope to find.

But such a search can be compared with looking for a needle in a haystack, with miles and miles of deer trails in the woods and no rhyme or reason to where an antler might be found.  Following predicted routes of deer travel may help increase the odds of finding an antler, but that is about the only helpful tip we can give readers.  Otherwise, it is luck + time spent searching.   

Hoyt Purinton enjoys hunting antlers in late winter, sometimes with his sons, as a winter or early-spring outdoor activity. It's also reason to get outdoors and walk in the woods during the time of year when other outdoor activities are at a low point.

Antlers found over a two-day period in spring by Hoyt Purinton.  Dark antler
at top shows signs of mice gnawing, and may have been in woods for a
full year or more.


Sometimes, Hoyt has learned, where one half might be discovered lying in snow, or among leaves, (depending on the time of winter or spring, and recent weather) the other half could be found nearby.  But there's no certainty, no rules.  Hoyt happens to possess a lucky eye, and he's often successful at locating antlers.  An antler dropped randomly by a buck can look much like dead cedar branches that litter the forest floor.  It's easy to walk right past despite keeping eyes trained on the ground.  A light snowfall can help by providing contrast, covering the otherwise dark ground. Too much snow will bury an antler, unless it is recently dropped or its tines are large enough to project upward.  

Losing antlers, beginning in January as a rule, happens when bucks renew antlers for the coming season.  A new set forces out the old, which then fall, more or less at random, when they're no longer attached to the deer's skull.  With rare exception, such as in an old or unhealthy buck, the new set will grow in larger and with more points added in each successive year.  Finding an antler with four, five or more significant points per antler may bode well for seeing trophy bucks in the coming year.

Why aren't antlers more commonly seen when strolling through the woods in summer, given the number of possible bucks on Washington Island?   Squirrels and mice like the mineral content and unless an antler is well-buried in debris, few antlers remain intact in the woods throughout a full year.   Another reason may be that we just aren't attuned to spotting them among the typical forest floor debris.

If you're interested and need advice, ask Hoyt or Kevin Krueger, both of whom enjoy antler hunting.

What to do with collected antlers is another question.  Hoyt displays dozens in his home and garage, given Kirsten's generous approval.  Artists and craftsmen (some of whom teach such crafts at Sievers School) incorporate them into a chandelier, lamp or piece of furniture.  If antlers are kept away from rodents, they will last indefinitely.

Get out in the woods and look!  

That's a wrap for this blog!  -  Dick Purinton

Tuesday, January 26, 2016

Large white pine and table in the field to the north of home.


Washington Island, Wisconsin -

(Note:   I've added an additional comment to the foot of this posting...1.28.16)

Readers curious to know about the changing conditions on Washington Island, and who look in frequently at the Ferry Line's webcams, will know that the photo above wasn't taken today.

I took this one while on skis - that's right, cross country skis - several weeks back when I was feeling quite frisky.   I skied modestly, or so I thought, two days in a row, and also fell a couple of times when just standing, talking with my daughter, Evy.  My skis slipped out from under me in quick order.  The result of that outing was further aggravation of my Achilles tendons, both legs, putting me pretty much out of such continued activity since then.  During that hiatus, the snow melted and skiing conditions deteriorated, anyway.

But this morning we awoke to a pleasing cover of about 5 inches of wet snow, delicately blanketing tree branches, power lines and roofs.  Peanuts, when compared to the storm out east, but it's much more pleasant to observe and be outdoors in this kind of a snowfall.  Today's temperatures of 30+ have already melted some of the snow, opening up patches on the drives and lawn.

Skiing partners on this day were daughter
Evy with her dog, Ozzie.  Unfortunately,
those conditions didn't last for long.


A week of cold weather, single digits most mornings, finally stiffened up the ice in Detroit Harbor, so that just one week ago we saw Jeffrey Andersen walking out on the ice, towing his pop-up shanty.  Must have caught a few perch, too, because he stayed until dark.  The following morning Mack Gunnlaugsson towed his ice shanty down Main Road to the shore, and morning after that he pulled it out into the open harbor with his three-wheeler.

Since then others joined in, and now there are half a dozen shanties, and more with pop-up fishing shelters adding to the scene.  Almost all fishermen still use lighter ATVs, as the report I received indicated only about 6 inches of ice on the outermost areas, and not enough to safely drive a pickup truck over the ice.

Digging out in a different setting

We recently added insulation to the attic over our home and attached garage by placing fiberglass batts over blown-in insulation.  Although this space is quite open, and I hadn't known anything was stored up there, a few interesting items were uncovered.

First were two large, framed photos, and we have no idea who the subjects are.  Mary Jo guesses they are relatives, maybe connecting with the Kalmbach side of her family.  The photos and frames are quite bulky, and evidently the once-popular jumbo portraits of those now long gone were of no particular interest to Arni and Mary when they lived in this home.  Partially covered by the blown-in insulation, we guessed they were placed up there many years ago.

One item I quickly recognized was the stainless "destroyer-style" wheel from the helm of the Washington, built and outfitted at Peterson Builders, Inc. in the spring of 1989.  PBI completed outfitting with parts and pieces left over from U. S. Navy contracts that PBI was awarded over several decades.

Jacob Richter married a Kalmbach daughter.  Perhaps
these are relations?


"It don't look or feel right," was a comment I seem to remember hearing the first time Arni stepped foot in the new ferry's wheelhouse on sea trials.  Naval Architect Tim Graul set it right by substituting one of walnut, custom-turned by Dan Austad in his woodshop.

But, just what happened to the stainless wheel was a question I occasionally wondered, and apparently Arni preferred it up in his attic rather than on someone else's wall.




Hoyt Purinton holds the stainless wheel in the adjacent photo.  He and others recall that when  the Washington was ready for delivery to the Island (in mid-June of 1989), a new, wooden wheel was in place.

Of course, with the Washington's power steering, even a wheel could be considered unnecessary, and it is sometimes dispensed with on vessels today in favor of a short stick or jogging lever connected to hydraulics.

Nothing quite like the feel and look of a wooden wheel, however, comfortable in the palm of your hand, as you mentally track the spokes while changing the rudder angle at night.

-  Dick Purinton

Note:  I received an email from Chuck Sena last night, who operated the C. G. Richter when still a college student, and he recalled this wheel - or one just like it - having been used on the C. G. when trips were made in summer to Gills Rock (perhaps very early 90s?)  A phone conversation with Erik Foss, who makes it a point to remember such detail, verified that this might have been the case.  If so, I had completely forgotten about this, so thanks for the correction, Chuck.

The C. G. was retrofitted with power steering at Peterson Builders about 1991, as I recall, when plating was also replaced above the chine at the water line.  This change from cable steering followed what was received by Captains as an improved feature when the Washington was built.  A similar power steering arrangement was engineered by Tim Graul, and it underwent a couple of versions.  The first steering pump didn't hold up as it should, and maybe this first trial was when a stainless wheel was substituted for the original, large maple wheel.   

In any case, the wooden wheel eventually was reinstalled, and it stayed on the boat through the sale to a Florida operator.  The C. G., last I've heard, is operating from St. Martins Island, Caribbean.  

Another feature of the photo I ran above, of Evy and her dog Ozzie on our ski outing, was that a second dog, Roxie, was further down the trail.  Sharp eyes, Erik!  - DP

Thursday, December 31, 2015

LAST HOURS OF 2015




Washington Island, Wisconsin -

We're down to counting the hours, now, some of us, to the end of the year 2015.

What's notable today?   For one thing, winter appears to have finally arrived, with a grand entrance of stormy weather.  First there were the high winds as Christmas Eve morning arrived.  This got everyone's attention.  Then, we entered back into a week of mild and calm air before the next one hit this past Monday afternoon, lasting well into the early morning of December 29.

Even higher winds than the Christmas Eve storm were sustained, over a good 12-hour period.  This most recent storm caused large windows facing the NE to flex during the highest gusts, and the winds were accompanied by moisture:  sleet, then snow.

My guess at snow levels, as I plowed and shoveled what had been clear pavement and green grass on Sunday, was a wind-drifted ten inches or so of snow.  Very hard to judge, and I guess the exact amount doesn't matter that much.   Other northeastern Wisconsin locations reported snowfall in excess of one foot.  This was a good start to getting snow cover before the temperatures drop even more.

Certain things happen when heavy snow and lower temperatures occur around open water.   Here, near the shallows at the end of Main Road, 'snow ice' began building southward during the storm, extending to the end of Snake Island.  This ice is still not safe enough to walk on, and and there are open pockets here and there.  It may not even stay, but break up, leave, and then refreeze, depending on winds and temperatures over the next few weeks.   But it's a start toward winter for those itching to ice fish, or travel over the ice by foot, skis or snowmobile, as winter gets its into its groove.

At the Island Ferry Dock, the gusting winds over open harbor waters blew spray across the piers and onto nearby objects, and it also made for slick walking.  The ferries moored in Detroit Harbor once again had their lines about to slide over the top of mooring posts.   The high water levels we're now experiencing, plus the deepened channel from dredging, allows for more sea action within the harbor near the docks.  This is one drawback apparent when there are such extremes in conditions as we experienced during in the last two storms.   Ice in the bay, and in the harbor, which we expect to see before too long, will serve to dampen such wave motion.

The photo below was taken by Paula Hedeen of Northport from her home Tuesday evening, and its a reminder of the contrasts that occur this time of year from one day to the next, with variations not only in weather, but also in the beauty of the landscape or seascape.

Ferry Washington returning home evening of December 29,
passing astern of cement carrier St. Mary's Challenger.


This blog marks the 299th that will be archived here on this website since 2010, for the benefit of those who have time on their hands and enjoy retracing steps and memories.  I should mention that, since updating my software, I seem to have lost the file and the touch for creating a Blog Notification Group.   Please consider becoming a follower, and I think then you'll have automatic notification of new postings.   Tell me if this does not work for you, and I will try something different.

Have a Happy New Year in 2016!

 - Dick Purinton


Thursday, December 24, 2015

THIS IS CHRISTMAS...

Con McDonald, Hoyt Purinton and Joel Gunnlaugsson rehang
a tire where a mooring pipe (foreground) gave way earlier
this morning.  


Washington Island, Wisconsin -

The 'Santa's Sleigh' carrying a timely shipment of UPS and FEDEX and U. S. Mail will make its appearance today, after all.

High winds during the night of the 23rd and into Christmas Eve day caused cancellation of the two morning ferries, and with it, passengers and freight anticipated to be ferried to the Island Thursday morning.

That delay in festivities will be resolved soon, when the afternoon ferries bring in the mail and freight packages delivered daily by UPS and FEDEX,  and more importantly, groceries and staples for Mann's Store.

I returned from a run to the grocery store for some salad greens. They were not to be found, because most such items were no longer in stock, purchased by those who plan ahead!   However, Jeff Mann suggested I come back around 3:30, after their grocery truck arrives and their shelves are once again stocked.  The Mann's Store truck is one of a number of vehicles backlogged from the morning's trip cancellations, until wind and seas settle down, allowing for resumed ferry crossing.

Swells from the WSW were strong, created by winds in excess of 40 mph reported during the night. A wicked sea found its way into Detroit Harbor, snapping ferry mooning lines and breaking off three mooring pipes.  The Washington, moored against the south side of the main dock, was the most vulnerable.    By 11:30, when the photo above was taken, most repairs had already been made, and the Washington was moved around to the end, ready for loading for a1:00pm departure.

Travelers waiting for a ferry to the Island were asked to be patient and to wait a bit on the Northport side of the crossing until trips resumed.  According to Janet Hanlin, who answered innumerable calls at the front desk of the Ferry Office, communications with the mainland weren't good, as the power was out for a period of time in certain peninsula locations.  


Joseph Block, rounding the sea buoy east of Pilot Island,
heading south against the lake seas.  The southern tip
of Detroit Island is at right, and view is looking across the
East Channel from the Sand Dunes Park, around noon today.










Earlier, around 10:00am, we watched from home with binoculars the white, breaking seas of the East Channel.  Several miles out in the lake, two vessels inched their way south through lake swells,  toward Porte des Morts and the relatively easier going to be encountered in the Bay of Green Bay.  The conning tower and mast of a tug could be seen, rolling its way toward the passage, seas breaking occasionally along its port side.

By 11:45, the ore carrier Joseph Block, which had been anchored, loaded, in the shelter of Washington Harbor, was observed heading eastbound through the Door toward a down-lake destination.  The Block reported dragging anchor as the wind came around westerly, prompting it to get underway.
   
Toward evening at our home, we're expecting a house full of relatives, young and old, and a few of whom we expect to arrive on one of the afternoon ferries.  Although we have no snow, a disappointment for some, air temperatures are still in the 30s, fine for most folks.  By nightfall, Christmas Eve will be observed once again across the land, as anticipated.

-   Dick Purinton



Monday, June 29, 2015

MORE ON THORDARSON

Washington Island, Wisconsin -

Recent postings have mentioned C. H. Thordarson and his renown for producing electrical equipment, and we fielded interest from people we met in Iceland who are familiar with his name and his reputation for invention and manufacturing.  We don't know just how much the Thordarson Electric Manufacturing Company contributed to the electrification of Iceland, or America for that matter, but reputation and his company's impact seems to have been far-reaching.

Friday, as we waited to board the ferry Washington in late afternoon for our return to the Island, we met  Paul Grieger, a man who occasionally come across items bearing the Thordarson Electric Company name as a collector.   He pulled from his car a piece of test equipment manufactured by the Thordarson Company that he was delivering to Rock Island for donation to the Thordarson display located in the northeast room of the boathouse.   He intended to camp on Rock Island for several days, his first visit there in 20 years.

Paul Nelsen Grieger holds a Thordarson Condenser Tester he
picked up at an auction, "The best one I've found so far."
Paul is a truck driver from Pewaukee, Wisconsin, and he has a side business called, "Paul's Cool Stuff."  He specializes in antiques, collectibles and vintage paper.   This Thordarson test unit is the best in terms of its condition of any he's come across, he said.  

I regret not asking him if it's still in working order, or if by "best" he referred to the condition of the face and case.   I also neglected to obtain the date of manufacture.  I'll have to visit the exhibit on Rock Island to learn more.  

Then, on Sunday morning, I drove out to meet the Karfi as it returned to Jackson Harbor.   I saw Tim Sweet getting off the ferry, ending his week as docent, along with his wife, at the lighthouse.   I asked Tim if he met the man with the Thordarson piece.   "Yes," he said, and it had been given to Park Manager Randy Holm for display in the boathouse.  Filing of paperwork is required before the state will provide official acceptance, but once this process moves along the public should be able to see this piece on display among other Thordarson artifacts in the near future.

 - Dick Purinton

Thursday, April 23, 2015

ISLAND WATERFRONT - Then and Now - Richter Ferry Line - Part XVIII

Ferry dock aerial 1978 -  Jon Gunnlaugson's  tanker Griffin is docked at
Hansen's Standard Oil (the concrete surface looks new in this photo) and the
 crew of the Eyrarbakki, largest of the three remaining ferries then, and in
its eighth year of service, prepares to discharge a Coke truck and other vehicles.  
Adjustable, hydraulic ramp in foreground is in its 4th season of use, the only
spot on the dock then set up for bow loading/unloading.  Voyageur (top) and
C. G. Richter are idled on this day.  Bob Bell's orange International Scout is
parked next to the ferry office, foreground.  A telephone booth is
handy, alongside the building for patrons coming off  the ferry.



Washington Island, Wisconsin -

We continue with the story of the Richter ownership and operation of the Ferry Line, now in its 75th year in this year, 2015.

The schedule comparison shown above is interesting for a couple of reasons.  For one, there was deference paid to Carl in 1940, with credit paid to "Carl Richter & Son."  This would soon change, and maybe it was more practicality than anything, acquiring a business name that would be readily associated with Washington Island.  But over time it was still the Richter name, Arni Richter's name, that would be closely associated with Island ferry service, and in a general sense, with Washington Island as a whole.  Arni's involvement in the Door County Chamber of Commerce, his role as a director for the Bank of Sturgeon Bay, and his staunch support of the Republican Party (that brought him in contact with several Republican governors, state legislators, and Congressional representatives) held both social and business implications for the Richters and the Ferry company. 

Another interesting comparison is found in examining the rates, where one-way passenger fares ($1.00 in 1940 vs. 87 cents in 1953) and auto rates were actually less in 1953 than in 1940.   Perhaps increased volume had something to do with those rates, but in 1953 there were two, relatively new ferries, Griffin (1946) and C. G. Richter (1950), still working off construction debt.   Farming and fishing were then two booming Island industries, with dairy and potato farming continuing apace, and commercial fishing was the king industry in terms of incomes and steady employment.  Those industries translated to a great deal of freight hauled, meaningful in terms of revenue for both the Anderson Transit Co. and the Ferry Line.  Perhaps the freight revenues helped to meaningfully support the business overall. 

The construction of the Voyageur in 1960 departed from the side-loading ferries that required wooden planks (later replaced by a steel plate) to span the gap between vessel and shore.  Although the Voyageur had only a single ramp, located in the bow, loading could be accomplished quickly by directing drivers and backing autos on board.  A creative crew with the right mix of traffic could load a dozen vehicles in a short time.  Oftentimes, the load was a mix of autos, trucks and trailers, and occasionally large equipment that earlier ferries simply were unable to carry.   

Hauling a semi by ferry was novel, unheard of until the Voyageur.  That was
why this first-time photo was taken of a J. W. Cartage truck aboard early in the
1960 season.   The design of a larger, open-deck ferry today seems a no-brainer,
but Percy Johnson spoke often of Arni's agonizing the day before he had to
sign a contract to build the Voyageur at Sturgeon Bay Shipbuilding and
Dry Dock. Financing was always a challenge, and Arni's business style was
to first have the major percentage of new construction costs in hand before laying
a keel, a pattern that has been followed to this day in keeping debt
to a minimum.


By 1970 traffic justified a second open-deck ferry, an even longer vessel named Eyrarbakki.  If the Voyageur had been a grand improvement for carrying vehicles of all sizes, the Eyrarbakki went one better.  She had both a bow and stern ramp, and rather than the restrictive open deck of 50 feet of the Voyageur,  at 87 feet LOA the Eyrarbakki had approximately a 70-foot opening, making possible the loading of just about any combination of truck and trailer that could be brought over the bow.  (Eyrarbakki still has the largest unrestricted height, open deck space of all of the ferries.)   Standard vehicles (if they required less than a 9-foot overhead clearance) could be easily loaded in a drive-on, drive-off arrangement, and overall capacity came to 18-20 autos.  There were still large "Detroit boats" being driven for comfort rather than concern for fuel prices in those days, but new, smaller Japanese models had joined the highway mix, plus Detroit's "compacts" that provided options for crews to load an extra car here and there, maximizing usable deck space on a busy day.  

A major drawback in loading the C. G. Richter- especially in low water,
and especially with a heavy load - dealt with regularly throughout winter,
was to drive loaded trucks over the side ramp, timing the roll of the boat so that
the rebound in buoyancy would support the rear axle's wheels as the major
weight came into play.


On a cold winter's day, the Noble's hull was moved
from a construction shed to an opening and turned upright.
using two cranes.  Shown with the upright hull at PBI
are Arni Richter, Dick Purinton and Harry Purinton, who
represented R. A. Stearn, Inc. Naval
Architects.  Harry did much of the structural design and
engineering on this ferry, and the Washington in 1989 when
working for Tim Graul Marine Design.
At the time the Robert Noble was constructed, Tim Graul
headed up the PBI commercial design division,
completing Robert Noble design details. 




With a new ferry C. G. Richter in 1950, another in 1960 (Voyageur) and a third in 1970 (Eyrarbakki), there came a public tendency to believe that a new ferry would be built "about every ten years."  Pushing this theory along (and based solely on the coincidental rise in tourism and the need to keep pace with summer traffic, not a pre-ordained circumstance) was yet another ferry designed and built for launch in early 1979.  

Robert Noble launch, April 30, 1979 at PBI.  90' x 36', with
two, 365 hp Cummins engines, with 175 passengers, and 10'6" overhead
on the aft vehicle deck, made this ferry quite versatile,
the best in the fleet at the time.


The Robert Noble's design would enlarge, slightly, upon the dimensions and capacity of the Eyrarbakki, and in so doing it would render the C. G. Richter less useful - almost obsolete - as a summertime vehicular ferry. 

The answer, in order to get use from an aging vessel that still had many nautical miles left under her keel, was to convert the C. G. to summer passenger-only use.  

By 1984, an extension of 70 feet had been made to the Northport Pier, and as a result Gills Rock became a "passenger excursion" port, with the C. G. competing in summer, first with the Yankee Clipper, owned by Charles Voight, then after 1987, with Voight's new, aluminum Island Clipper.   

One fact of business Arni liked to recite was that each new ferry exceeded in cost the sum total of dollars spent on all previous ferries.  This reflected not only the nature of new construction, with increased complexity in safety equipment and design features intended to meet U. S. Coast Guard regulation, but also the tendency to improve each new ferry in size and utility.  With increased size came increased horsepower, and larger transmissions, all with added cost.   Each new construction contract was supported with the optimism that it would prove to be the right decision, and that a new ferry would help to sustain, if not increase, business for the Ferry Line and the Island.

Adding to the "ten year cycle" myth circulating in Door waters would be yet another ferry, Washington, also built by Peterson Builders, Inc., this one designed start-to-finish by Tim Graul Marine Design (TGMD).  It should be noted that during this period, Peterson Builders was attempting to transition from a heavy dependency on U. S. Naval contracts, which were becoming harder to obtain, while at Bay Shipbuilding nearly all shipbuilding efforts were going into the large commercial ship construction or repairs for the laker fleet.  Bay Ship didn't seek new, small vessel construction at this time, although that approach would change again in time.  

The Washington's design was a departure from previous ferries, most notably for the use of a center pedestal, or trunk, that supported a substantial superstructure.   The Washington had greater length and beam (100-ft. x 37-ft.) than previous ferries, but the increased overall dimensions, as it turned out, were somewhat offset by cramped lane conditions alongside the trunk, which incorporated public heads, engine room and passenger deck access stairs, piping and wiring runs, and light cargo storage.

Every vessel results in compromises, however, and overall, this ferry became a summertime savior by taking on long lines of vehicles and passengers, loading them with ease.   In certain instances, she's also been used in the freeze-up stages of December, having good sea keeping abilities, with less propensity to toss spray over the deck.  But, summertime use was its main purpose, to meet with the still-increasing patterns in traffic.   The 1990s, with dot.com financial bubbles not yet ready to burst, also brought increasing tourism, very much on the rise in Door County as a whole. This ferry, Washington, coupled with a new break wall built in 1994 that surrounded the Northport dock and made landings much less subject to wind and waves, became a very useful piece of equipment.  

Washington set to depart.   Crew: (L to R)  Jeff Cornell, Laura (Shellswick)
Lerner and Erik Foss.


The age of the C. G. Richter, having design qualities unacceptable to owners of longer and higher vehicles, and with increased bulk freight demand in the dead of winter (fewer Island goods were being stockpiled in advance, with less small package freight), and without the mass and horsepower to bull through frequently encountered ice conditions, and with its less-than-adequate passenger accommodations  (both heads and cabin space) her days were numbered.

But, it would take substantially more capital, plus the right design - whatever that might be - before a contract would be signed for a new winter ferry.  That timing proved to be 2002, a decision that followed much internal discussion and regular, annual deposits into a construction fund.  By that time, Arni Richter had retired (after making an official retirement statement, but one not always heeded!), and the new ferry to bear his name would have greater size, horsepower, and capacity than any of the other ferries.  And as before, it would result in greater expense than all previous ferry vessels combined!   

This card appeared anonymously one day at the Ferry Line office.
Its creator was quite perceptive of the divergence of opinion as
construction of the Arni J. Richter took shape in Nov. 2002.
(Taken on day of keel-laying at Bay Shipbuilding.)

The Arni J., as this ferry quickly became known, at 104-ft. LOA could carry 18 vehicles with ease, having broad vehicle lanes nearly 10 feet wide, with passenger cabins and passenger deck access, heads and engine room access offset in a structure along the starboard rail, giving it capability to carry several semi trucks by driving them straight through - this ferry came to be a considerable improvement for  winter and summer ferry service.  

Capt. Bill Jorgenson at wheel of Arni J., in ice.  Hull speed is
a consistent several knots, even in solid ice 10' thick.
Best of all, as it turned out the Arni J.  exhibited wonderful icebreaking capabilities.   This was due, in no small part, through copying the lines of the successful design of the most recent Drummond Islander ferry at Point DeTour, Michigan, also designed by TGMD.  A flight to Drummond Island in a small plane piloted by Graul convinced Arni there just might be a new and better design possible, rather than repeating or enlarging the C. G. Richter design.  (At one point, several years earlier, Arni had stroked his chin while he mused, "I don't think you'll ever find another design as good as the C. G. Richter for winter work!")

If Arni hadn't entirely agreed with the general design and parameters for the new ferry as they were developed with Tim Graul's expertise, he did go so far as to agree to put his name to it, and then to strike the bottle of champagne against a gangway upright when the moment for public approval was ripe.  His oft-repeated statement at age 92, and later, and not without intended humor, was:  "If my name's on it, it better be good!"  

-  Dick Purinton

Arni joked, after his first swing produced only a thud, that
he "might be getting a bit weak."  The occasion was
witnessed and enjoyed by several hundred people, and
accompanied by music, stories and adulations.

Friday, January 30, 2015

ISLAND WATERFRONT - Then and Now - Part II

Ole Christiansen's boatyard, with the Flotilla in the foreground on
blocks, and the Wisconsin moored at the edge of the solid ice.
Quite possibly this photo was one of Bill Jepson's, taken around 1930, prior to
his purchase of the dock property.  Today vehicles
drive out onto this pier to board over what we
refer to as the "south ramp."


Washington Island, Wisconsin -

Watching Mike Kahr drive steel sheets with his reciprocating hydraulic hammer yesterday, and noting the relative ease with which the sheets were driven into the bottom, caused me to think back on some of the other projects we've had over the years.

Many feet of steel sheeting were driven, especially at Northport around 1982-3, when John Fitzgerald and his crew extended the Northport Pier by some 70 feet, adding a slight wedge to the north corner, the design intention being to lessen lake swell action curling around the northern side of the pier.   That project came 11 years before the stone break wall was constructed with the aid of a Wisconsin DOT grant to Door County.   Prior to the breakwater of 1994, the pier projected unprotected approximately 100 yards from shore, an obstacle to waves and moving ice.

Welder Mike Brown fabricates the corner piece
from two sheets that can't be interlocked due
to the degree of bend.  In the background, Mike
Kahr uses a hydraulic hammer to drive steel sheets.

In order to accomplish the work of extending the pier in 1982, contractor Fitzgerald rented a diesel hammer.   The solid, heavy steel head slid up and down in a steel framework, powered at the bottom of the downstroke by an explosion (combustion chamber) that caused it to rise back up several feet in the air, then drop again to repeat the process.  The hammer head rig was positioned over the sheet being driven, and the whole works was held in place by a crane.  Before that project, John used a pile driver block that was repeatedly raised by crane cable 8-10 feet and then let free-fall, with gravity doing the pounding, one tap at a time.


The hydraulic hammer arrangement used today by Mike Kahr is rapid and flexible.  It seems to do a good job until progress is stopped by a large stone, and that was the case with several sheets on the inside of the slip.  Another improvement in equipment, too, is that this hammer head can be shifted quickly from one sheet to another by just lifting the arm of the excavator.   Kahr can use the excavator arm to pull or push plates to achieve the best vertical alignment.  And, it takes only minutes to detach the breaker head and install the backhoe's bucket for other work.

Contractor John Fitzgerald extended the
Northport pier, shown here in the summer of
1982 with a diesel hammer for driving sheets.


In all, over 200 linear feet of pier were enclosed with
sheeting at Northport in 1982.  Here, worker Don Beckstrom
cuts sheets to length.  Some sheets were driven in water depths
of 16 feet.
It was 1975 (now 40 years ago this June)  that the first hydraulic ramp was installed for easier, and safer, loading of ferries with bow ramps.  At that time, only the north slip was suitable for bow-loading of vehicles, in particular large trucks, buses, or trailers.   In 1960, when the first bow-loading ferry Voyageur was brought into service, enabling carriage of trucks longer than 25-feet for the first time, a pile of gravel was sculpted to roughly accommodate variations in water levels from season-to-season.  A thick rubber mat on the crest of the pile kept the steel ramp from rubbing against the gravel.   It was crude, but it worked, along with procedures that kept the vessel in  trim during loading.  Often this would mean shifting a few vehicles fore or aft to keep the bow height (and thus the bow ramp angle) in adjustment, sparing mufflers and tail pipes.


Myron LaPlant operated machinery for
John Fitzgerald.  
Ferry captain Dave Johnson backed this auto
onto the ferry (about 1972-73) over the gravel mound with rubber mat.
Mound accounted for height differences between
boat decks and dock, and with some work could be
seasonally adjusted by grading or adding more fill.


With a greater number of motor coaches, campers, trailered pleasure boats and heavy trucks, as well as an increase in general tourism traffic in summer, by the 1970s the gravel pile was no longer a good option.  



Arni Richter wanted to install a hydraulic ramp strong enough to hold a loaded semi.   R. A. Stearn Naval Architects, Sturgeon Bay, supplied engineering for the hydraulics (based, in part, on experience gained with engineering early Travelift units) and my father,  Harry Purinton, provided a fair amount of time - some personal and some through R. A. Stearn where he worked with hull and structure - to design the ramp details and footings.

Once steel was ordered, ferry captain John Hanlin cut and welded, and assembled the ramp in a level opening near the bike shop garage.  Kermit Jorgenson operated Njord Heim's crane to lift, and then turn over, the ramp.   Few pieces of equipment were available on the island at that time for such tasks, whereas now there are numerous loaders and excavators with the lifting capacity and reach for such an operation.

While the steel work progressed, a hole was excavated near the water for footings.  By late June, the foundation was ready to receive the ramp, and by the weekend of the Fourth of July, the ramp was in a pinned position, ready to be driven across, but it took several more days to complete electrical connections (Earl Frank was the electrician) and pipe the hydraulics (work by ferry crew), making the ramp fully adjustable at last.

During the construction of the foundation, ferries landed at the end of the south dock.  Today at that location, a wider, longer and heavier ramp is available,  installed in 2001.   The rams on this newer ramp permit adjustment under heavy loads, whereas the original 1975 ramp was incapable of adjustment under load, due to smaller rams and lower pump pressures.  

Kermit Jorgenson operated the crane as
Dick Hanlin offered advice.  Eldred
Ellefson, who loaned the crane from Njord Heim,
 observed in foreground as the
20 x 20 ft. ramp was turned over.







Setting wooden forms for pouring the first hydraulic ramp footings,
late June, 1975.    (l to r) Jensen brothers Norbert, Rich and Emil with
John Herschberger and Harvey Jensen, uncle of the brothers.
(Unknown observer.) 




A slightly different angle showing turning of the first adjustable ramp,
with Kermit Jorgenson at the crane controls.  Ferry crew Tim Jutila and John Hanlin
are on far side, and John Herschberger has his back to camera.  (June 1975)

Crowded near to the old office building, the foundation was poured for the
ramp.  Here, Earl Frank runs wire (far left), John Herschberger backfills
with a shovel, and at the rear of the box Arni Richter and John Hanlin
discuss installation of ramp hinges.  (June 1975)


Ferry captain John Hanlin, who was
also skilled working with steel.


Such improvements as shore ramps are quickly absorbed into the operation, becoming one more slight adjustment before loading or unloading, and a major adjustment when the load is long, low or exceedingly heavy.   The general public may not realize the benefits, but the advent of one, good hydraulic ramp on the island meant quicker and easier loading of each ferry using the bow ramp (the C. G. Richter still required side loading, until about 1989 when the Washington (dis)placed it into passenger only status).  In a few years' time, by 1980, a similar ramp was installed at Gills Rock, and early in the summer of 1985, the north ramp at Northport was installed.  In time, smaller ramps also went in at the island's south landing, and at Northport's winter landing slot.  All later ramps were based on the original 1975 structural design, with modifications made as needed.

-  Dick Purinton



Monday, December 16, 2013

ICE SEASON BEGINS

Arni J. Richter passing Roen dredge, 8:05 a.m., Dec. 16.  
Washington Island, Wisconsin -

Earlier than anticipated, deep cold temperatures halted the Detroit Harbor dredging project today, and it also marks the beginning of the Arni J. Richter as the ferry of choice for the next several months.

Single-digit temperatures around Wisconsin Sunday, plus ice in the Door passage, means we're not far from seeing the bay tighten up with ice.   Before Sunday noon, when bay ice from the western shore filled in the Door passage, the Eyrarbakki was used for most ferry runs.  We may reach 32 degrees by Christmas Day, but otherwise, its been consistently cold, and snowy.

When this photo was taken last week, several
nights' ice had formed in the channel.  It was later
cleared with a ferry stern wake and northerly wind.
Here, the Eyrarbakki is
pictured underway.    The Washington
and Robert Noble (hidden behind the Washington, to the right)
were drained and winterized prior to the previous,
deep cold snap.

























Colder temperatures of teens and single-digits, coupled with strong westerly winds, hampered dredging operations during the past week.   The scow shown being loaded in the photo above was receiving the last of the dredged spoils for this season.  Roen crewmen will begin to lay up their equipment later today, mooring the construction and material barges near the island ferry terminal.  The tug Stephen M. Asher will moor at the south side of the Ferry Line property, where shore power can be obtained.

With ever-decreasing production this past week, and already down to one shift, it was a matter of time before the call was made by Roen and Foth to stand down.

When it was still possible to do so last week, the Roen crew dragged the channel to assure uniform depths, and to determine if any large, upturned stones were missed by the excavator operator.  Errant stones lying above project depth could be struck inadvertently by ferry propellers this winter when transiting the channel.   However, none were found.  In the accompanying photo are stones recently dug from the channel depths.   They will be added to the upland pile of stones previously separated from the more easily trucked spoils.

Blocks of stone three-by-four feet in dimension, like the one above, have been encountered all too frequently. 
Exactly when this project might resume is anyone's guess.  This will be determined in part by the WDNR's allowance for dredging after March 15th -  a date when, the claim is made, fish may begin to spawn.  When the heaviest ice disappears is another factor.   If ice remains well into April, and permit approval is not forthcoming from WDNR to continue in April and May, then the project may stall until late summer or fall.  This, in turn, will have impact in delaying repair of island roads.  Road repairs won't be made until the trucking ends.

An update on the dredging project progress will appear in the next issue of the Island Observer.

Note:   In the most recent Island Observer I carelessly wrote that Foth Construction Manager Ken Aukerman patrolled the trucking route and tossed spilled stones from the pavement into the grassy roadside.  That was incorrect.  Aukerman brings them to the dumping site where he hands them over to Tom Jordan, making the point that truckers should pick up after themselves, or be more careful. 

-  Dick Purinton

Sunday, April 28, 2013

MID-AFTERNOON CAPRICE?


DETROIT HARBOR, WASHINGTON ISLAND - 

Spring is officially here.  

This afternoon, in the 60-degree warmth of the marsh, the snapping turtle population cavorted in their habitat.  Perhaps because of the sunshine, each of the turtles approached seemed lethargic. 

I was about to get my first close-up shots of turtles in the throes of passion (something I had hoped to capture with camera) and I felt somewhat like a voyeur.   But when I approached, this pair was indifferent and did not move.  It's impossible, of course, to get into in the minds of turtles - at least a male turtle.  These reptiles haven't significantly changed in several million years, and they know exactly what they are about, but it appeared to me this pair lounged in post-coital afterglow, enjoying closeness in the soft ooze of the Bayou.  (Note contented expression of male, top.)  

Previously when such activities were observed, it was always from a distance. Then, turtles jockeyed for position and occasionally clashed with one another, movements that were often super-quick, surprising for reptiles with a reputation for sloth.  

We had concern for turtle survival over this past winter, and time will tell if the local population count appears similar to last year.   A soft mud bottom underneath water, with winter's ice topping it all, seemed to make this spot ideal for their wintering.  But last December's rapid drop in water levels exposed their favored mud habitat to freezing cold.  This occurred shortly after the turtles had already submerged in mud for hibernation, and some of them might have frozen, we conjectured.  The appearance now of these turtles bodes well for the future population of snapping turtles here.

After nearly five months of survival-induced
abstainance, broken by Sunday's mood lighting,
turtles were observed "getting it on," as it were.
There are other signs of spring here, too.  The lone egret of last week is now a pair, and they are joined by several great blue herons.  Three eagles flew freely over the harbor, while at the same time turkey vultures circled on the updrafts.  A kingfisher worked the waterfront while a muskrat paddled the surface near shore on an afternoon excursion.   

Wednesday evening in the light of the full moon we observed a deer pausing in the shaft of moonbeam, while just beyond it, offshore, swans swam bout.  It was a magical scene.

Other shifts noted

Winter ferry Arni J. Richter took over the daily ferry schedule January 21st, and each day from then through last Wednesday, April 24th, ferry trips were from the Potato Dock.

Last Thursday morning, April 25th, with water levels having rebounded - but still lower than this same time last year by about 6 inches - the ferry Washington loaded traffic at the normal island dock location.  This was good news for all concerned:   the public (many of whom found backing on the ferry a challenge), and our crew (who now have better access to maintenance facilities, supplies, and a ticket booth).   For the moment the AJR will stay moored at the Potato Dock.  A further rise of 10 inches or so should enable use of that ferry in the channel, too, and we fully expect this could happen by Memorial Day weekend.  Time will tell, but the heavy rainfall of last week and the run-off from snow will continue to have a positive effect on the level of Lake Michigan.

- Dick Purinton